October Production Update – Panama Project moves into over-drive.

Posted at Noviembre 03, 2017

Panama Project moves into over-drive.

Shipment 3 for the Panama Project – 6700 frames ready. Logistically challenging but all on schedule.

The roller warehouse is also filling up ready to ship out of WA in early November.

76 x 2200mm BW Picking frames and a couple of quality tracking assemblies destined NSW.
Engineering and the fabrication shop will be kept very busy until the end of the year.